Transformer sizing calculator
Standard transformer kVA for a load, primary and secondary full-load currents, and overcurrent protection guidance under CEC Section 26.
Your job
Used when the load is entered as kVA.
Used when the load is entered as secondary amperes.
Growth allowance added to the load before choosing a standard size.
Answer
- Standard transformer
- 45 kVA three-phase
- Load including spare capacity
- 36 kVA (load 30 kVA)
- Primary full-load current
- 43.3 A at 600 V
- Secondary full-load current
- 124.9 A at 208 V
- Primary protection, 125%
- 54.1 A calculated; 60 A standard
- Secondary protection, 125%
- 156.1 A calculated; 175 A standard
- Primary-only protection calculation shown: 54.1 A before selection of a standard device. Verify the permitted transformer overcurrent-protection limits and standard-device treatment in the electrical code edition adopted by your province and confirm with the authority having jurisdiction.
- With secondary protection at up to 125% of the secondary current (156.1 A) the primary protection may be set higher. Read the transformer protection rule in your adopted CEC edition for the exact limits.
Method: kVA = V x I (single-phase) or 1.732 x V x I (three-phase) / 1000; standard distribution kVA ratings; CEC transformer overcurrent-protection requirements, described in words only; verify the exact limits in the edition adopted by your province. Standard device ratings shown by the calculator are a short list of common sizes; Check against the CEC edition and amendments your province adopts; confirm with the authority having jurisdiction.
Estimating aid based on a summary of the CEC. Provinces adopt different editions and amendments. Confirm with the authority having jurisdiction, and the engineer of record where one is involved.
Priced takeoff
- Dry-type transformer 45 kVA, 600-120/208 V$7,351.791 ea at $7,351.798 h
- Materials
- $7,351.79
- Labour, 8 h at $118.00
- $944.00
- Your cost, before markup and tax
- $8,295.79
Reference prices are dated baselines (2026-11) for Ontario. Confirm them with your supplier. In TradeQuote PRO your own saved prices replace these.
How it works
You enter 7 inputs. The calculator returns the quantities, rounds them up the way the material is sold, and lists the takeoff so it can be priced.
- Load entered as.
- Load (kVA). Used when the load is entered as kVA.
- Load current (A). Used when the load is entered as secondary amperes.
- Phases.
- Primary voltage.
- Secondary voltage.
- Spare capacity (%). Growth allowance added to the load before choosing a standard size.
The method
- kVA = V x I (single-phase) or 1.732 x V x I (three-phase) / 1000; standard distribution kVA ratings
- CEC transformer overcurrent-protection requirements, described in words only; verify the exact limits in the edition adopted by your province. Standard device ratings shown by the calculator are a short list of common sizes
- Check against the CEC edition and amendments your province adopts; confirm with the authority having jurisdiction.
Check results against the code and manufacturer data that apply to your job. Prices are dated baselines to confirm with a supplier.
Add this to a real estimate in TradeQuote PRO
The takeoff lands as estimate lines with your prices, markup and tax, then becomes a proposal the client signs.
More electrical calculators
- Voltage drop calculatorVoltage drop in volts and per cent for copper or aluminum conductors, checked against the Canadian Electrical Code 3% and 5% limits, with the smallest size that passes.
- Conductor check (ampacity)Checks a conductor against a load: required ampacity with the continuous-load factor against the ampacity you read from your code book, corrected for ambient and conductor count, with pass or fail.
- Conduit fill calculatorConduit fill from the conductor and conduit diameters you enter, checked against the 53/31/40 per cent fill limits, with conduit, couplings, connectors and wire for the takeoff.
- Box fill calculatorAdds up the applicable box-fill allowances you enter for conductors, devices and clamps, and compares the total with the volume marked on the box.