Box fill calculator

Adds up the applicable box-fill allowances you enter for conductors, devices and clamps, and compares the total with the volume marked on the box.

Your job

Read the volume marked on the box (or its spec sheet). 0 means not entered yet.

Count the conductors the rule says to count, including any bonding conductors your code book counts. Each conductor that enters and ends in the box counts once; a through-wire counts once.

Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.

Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.

Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.

Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.

Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.

How many devices are in the box.

Volume allowance for one device, in mL, from the applicable box-fill requirements in your adopted electrical code. Use the value that applies to the conductors and device involved.

Count of clamp sets inside the box, if any.

Volume allowance for internal clamps, in mL, from the applicable box-fill requirements in your adopted electrical code. Leave at 0 for clamps that are not inside the box.

Enter any other allowances required by the box-fill provisions in your adopted electrical code, worked out from your code book and added together.

Only used to price the box. The volume that counts is the one you typed from the marking.

Answer

Result
Enter the box volume
Volume required
0 mL so far (allowances missing)
Box volume as marked
not entered
Space remaining
n/a
Breakdown
conductors 0 mL, devices 0 mL, clamps 0 mL, other 0 mL
  • 4 x 14 AWG counted but no allowance was entered for 14 AWG. Enter the applicable figure from your adopted electrical code.
  • Devices are counted but no allowance per device was entered. Look up the applicable allowance in your adopted electrical code.
  • Enter the box volume marked on the box to get a pass or fail.

Method: Applicable box-fill requirements in the electrical code adopted in your jurisdiction: all volume allowances are typed by the user from their own code book; This calculator adds the volumes and compares them with the box marking; no box or conductor volume table is built in; Check against the CEC edition and amendments your province adopts; confirm with the authority having jurisdiction.

Estimating aid based on a summary of the CEC. Provinces adopt different editions and amendments. Confirm with the authority having jurisdiction, and the engineer of record where one is involved.

How it works

You enter 18 inputs. The calculator returns the quantities, rounds them up the way the material is sold, and lists the takeoff so it can be priced.

  • Box volume as marked on the box (mL). Read the volume marked on the box (or its spec sheet). 0 means not entered yet.
  • 14 AWG conductors. Count the conductors the rule says to count, including any bonding conductors your code book counts. Each conductor that enters and ends in the box counts once; a through-wire counts once.
  • 14 AWG allowance per conductor (mL). Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.
  • 12 AWG conductors.
  • 12 AWG allowance per conductor (mL). Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.
  • 10 AWG conductors.
  • 10 AWG allowance per conductor (mL). Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.
  • 8 AWG conductors.
  • 8 AWG allowance per conductor (mL). Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.
  • 6 AWG conductors.
  • 6 AWG allowance per conductor (mL). Volume allowance per conductor of this size, in mL, from the applicable box-fill table in the electrical code adopted in your jurisdiction. Leave at 0 until you have read it.
  • Switches and receptacles. How many devices are in the box.
  • Allowance per device (mL). Volume allowance for one device, in mL, from the applicable box-fill requirements in your adopted electrical code. Use the value that applies to the conductors and device involved.
  • Internal cable clamps. Count of clamp sets inside the box, if any.
  • Allowance per clamp set (mL). Volume allowance for internal clamps, in mL, from the applicable box-fill requirements in your adopted electrical code. Leave at 0 for clamps that are not inside the box.
  • Other allowances, total (mL). Enter any other allowances required by the box-fill provisions in your adopted electrical code, worked out from your code book and added together.
  • Box for pricing (optional). Only used to price the box. The volume that counts is the one you typed from the marking.
  • Number of these boxes.

The method

  • Applicable box-fill requirements in the electrical code adopted in your jurisdiction: all volume allowances are typed by the user from their own code book
  • This calculator adds the volumes and compares them with the box marking; no box or conductor volume table is built in
  • Check against the CEC edition and amendments your province adopts; confirm with the authority having jurisdiction.

Check results against the code and manufacturer data that apply to your job. Prices are dated baselines to confirm with a supplier.

Add this to a real estimate in TradeQuote PRO

The takeoff lands as estimate lines with your prices, markup and tax, then becomes a proposal the client signs.

Start free trial

More electrical calculators