Founding offer: 40% off for the first 25 companies

Quote it once. Win it, bill it, and know it paid.

Estimating and job management for Canadian electrical, industrial and general contractors. Price from regional costs, send a proposal your client signs on a phone, bill with holdback, and watch the margin while the job is still running.

14-day free trial, no credit card. The demo needs no signup either.

Build a quote. Change anything.

Typical scope. Edit any quantity.11 lines
  • Loadcentre 200 A, 40/80 circuit, main breakerea$1,019.97
  • Meter socket 200 Aea$536.70
  • RW90 stranded copper building wire 2/0 AWGm$1,236.35
  • Bare copper ground wire 6 AWGm$47.89
  • EMT conduit 2 inm$771.18
Materials
$2,218.21
Labour, 18.47 h at $99.00
$1,828.53
Markup 15%
$607.01
Tax 13% (ON)
$604.99
Total to the client$5,258.74

Reference prices are dated baselines (2026-11) for Ontario. Confirm with your supplier before you send it.

Build this quote in TradeQuote PRO

Electrical and industrial first. General trades too.

  • Electrical
  • Industrial shutdowns
  • Plumbing
  • HVAC
  • Carpentry
  • Drywall
  • Roofing

Seven places a good job quietly loses money.

Each one has a fix in the product. The pictures are drawn from the same engine you get in the trial.

Quoting takes your evenings

Every estimate starts from a blank sheet, a supplier flyer and a guess at the labour. By the time the number is ready, the client has called someone else.

Pick the job, set the size, and get a priced estimate with regional material costs, a labour rate for your trade and province, your markup and the right tax. Change any line and the total follows.

Pot-light retrofit, 10 lights

The same job, priced for each region with its own tax and labour rate.

  • Ontario tax 13%$2,354
  • Alberta tax 5%$2,386
  • British Columbia tax 5%$2,293
  • Quebec tax 14.975%$2,768

The small parts eat your margin

The panel and the meter are on the list. The connectors, the ground rods and the twelve breakers are not, and you eat them.

Trade calculators build the whole takeoff, small parts included. Every price is a dated baseline, and your own supplier price always wins over it once you save it.

200 A service upgrade

What you wrote down is the panel and the meter. The takeoff also lists:

  • EMT set-screw connector 2 in4 ea
  • Ground rod 5/8 in x 10 ft with clamp2 ea
  • Breaker 15 A 1-pole8 ea
  • Breaker 20 A 1-pole6 ea

Priced from the cost book, 2026-11 baseline.

Approved by text is not approved

The client said yes in a message, then the scope grew, and nobody can show what was agreed or what the extra cost.

The proposal comes from the same record as the estimate and the client signs it on their phone. Change orders are priced, signed the same way, and update the contract total.

Proposal for Sample Client

EV charger install

$2,403

Sample Client

Signed on the client's phone

SIGNED

Change order 1: second charger circuit

Adds $1,934. Approved by the client, contract updated.

Your cash sits in holdbacks and late invoices

Progress draws, holdback and tax are worked out by hand, and the invoice that is thirty days late is the one nobody remembers.

Progress billing works out the draw, the holdback and the tax for you, and receivables flag overdue invoices every day, in the app and by email.

Basement finish, progress billing

Sample schedule on this quote with 10% holdback. Set your own.

DrawHoldbackDue with tax
Draw 1, framing and rough-in$1,445$14,694
Draw 2, drywall and finish$1,445$14,694
Final draw$722$7,347

Holdback you are owed stays on the books until it is released, so it is never forgotten.

You learn if a job paid after it is over

Timecards are on paper, supplier invoices are in a drawer, and the real margin shows up months later.

Every job carries its budget from the estimate. Approved timecards and costs land against it as the work happens, so a drifting job shows while you can still fix it.

Job costing, 60% complete

Sample job
  • Materials58% of budget spent
  • Labour hours74% of budget spent
  • Subs and rentals31% of budget spent

The white mark is how far along the job is. Labour is running ahead of it, so you see it while there is still time to act, not at the final invoice.

Safety paperwork is a second job

LOTO permits, tailgate meetings and inspections live in binders, and a sub’s insurance runs out without anyone noticing.

Field and safety records are done on a phone with big buttons, signed off in order, and expiring insurance and WCB clearances are flagged before they lapse.

Field and safety records

Sample
  • LOTO permitIsolation verified, 3 of 3 signed
  • Tailgate meetingCrew of 6 acknowledged
  • Daily log with photosForeman signed
  • Sub WCB clearanceExpires in 21 days, flagged

Five tools that do not talk to each other

The estimate is in a spreadsheet, the proposal is a PDF, the hours are on paper and the invoice is in another app. Every handoff is a re-type.

One record runs from the first price to the final margin. You enter things once, and each stage starts from the one before it.

One record from first price to final margin

  1. Estimate
  2. Proposal
  3. Job
  4. Change orders
  5. Invoices
  6. Job cost

Instead of

  • a spreadsheet
  • a PDF template
  • paper timecards
  • a texts-and-photos thread
  • a separate invoicing app

Six engines behind one quote.

Cost intelligence

A cost book of 336 priced items, adjusted for 35 regions, with provincial tax and a burdened labour rate. Baselines are dated 2026-11. Save your own price and it replaces ours.

See it price a job

Trade calculators

21 calculators that return a quantity, a method and a takeoff you can price. They are free to use, no signup.

Open the calculators

AI estimator

Describe the job in your own words and get draft estimate lines priced by the same cost book. The AI assistant can also run the calculators for sizes and quantities. You review and edit every line before anything goes to a client.

Proposals with e-signature

A clean, printable proposal from the estimate, a link the client opens on a phone, and a signature that is stored with the record.

Watch a proposal get signed

Job costing

Budget, actual cost and margin on every job, fed by approved timecards and costs, with change orders folded into the contract.

Field and safety

Timecards with foreman approval, daily logs with photos, LOTO permits, tailgate meetings and inspections with ordered sign-offs.

From the first call to the final invoice in three moves.

  1. 1

    Pick or describe the job

    Start from a job template, a calculator or a plain-English description. Choose the region and the size.

  2. 2

    Check the priced estimate

    Materials, labour, markup and tax are worked out. Edit what you know better than the book does.

  3. 3

    Send it, sign it, bill it

    The client signs on their phone. Change orders, progress draws and holdback follow on the same record.

One plan. Every module. Your whole crew.

A flat monthly price in Canadian dollars for the company, not per person. Start with 14 days free and no credit card.

  • Estimates and proposals from one record, printed with your letterhead
  • Timecards with foreman approval, by job
  • Priced change orders with client sign-off that update the contract
  • Invoices and progress draws with holdback, tax and receivables
  • Job costing: budget, actual cost and margin on every job
  • LOTO permits, tailgate meetings and safety inspections with ordered sign-offs
  • Daily alerts for overdue invoices, expiring insurance and open safety items
  • Sub compliance: WCB clearance and insurance tracking

TradeQuote PRO

$299

CAD / month, plus applicable tax

Founding offer: $179.40 a month for as long as you stay subscribed. 25 spots.

Start free trialSee what is included

Questions contractors ask first

Is the live demo really free?

Yes. The demo and the calculators need no account. Nothing you enter is saved or sent anywhere.

Where do the prices come from?

Reference prices are dated baselines (cost book 2026-11) checked against public retailer and guide prices, adjusted by region. They are a starting point. Confirm them with your supplier, and save your own price to override ours.

Does it handle Canadian tax and holdback?

Tax follows the province: GST, HST, PST and QST are set by region. In BC, Saskatchewan and Manitoba the client is charged GST while PST on installed materials sits in your cost. Progress billing carries holdback on every draw.

Who is it for?

Electrical and industrial contractors first, and general trades such as drywall, roofing and carpentry. It is built around Canadian work, codes and paperwork.

How many people can use it?

The price is for your company, not per person. Invite your crew and give each person a role.

What happens after the trial?

Every account starts with a 14-day free trial and no credit card. If you do not subscribe, your records stay readable.

Your next quote can be the first one you build here.

Start the trial today, or run the demo first. Either way, you see a priced estimate before you sign up for anything.